ITAC Assessment: GT0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Concrete Artifacts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area 58,000
ft2
Annual Production 7,000,000
units
Production Hrs. Annual 3,650
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,883 425,264
kWh
Electricity Demand $28,753 1,497
kW-mo/yr
Electricity Fees $1,585 -
Natural Gas $46,403 7,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7314: Reduce ventilation air $6,440 $7,500 - - - $6,440
-
MMBtu
- - - - -
02 2.7314: Reduce ventilation air $1,430 $3,000 - - - $1,430
-
MMBtu
- - - - -
03 2.7314: Reduce ventilation air $2,710 $1,500 - - - $2,710
-
MMBtu
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,050 $14,205 $1,653
64,478
kWh
$3,265
-
kW-mo/yr
$132 - - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $790 $250 $196
7,620
kWh
$576
-
kW-mo/yr
$18 - - - - - -
06 3.8314: Purchase high materials in returnable bulk containers $6,239 $22,000 - - - - - $63
-
lb
- - $6,176
07 2.8114: Change rate schedules or other changes in utility service $3,000 - - - - - - - - $3,000 -
08 4.213: Purchase material from supplier in customized packaging $10,300 $3,750 - - - - - - $10,300 - -
09 3.4155: Meter waste water $870 $500 - - - - $870
-
Tgal
- - - -
TOTAL RECOMMENDED $36,829 $52,705 $1,849
72,098
kWh
$3,841
-
kW-mo/yr
$150 $10,580
-
MMBtu
$870
-
Tgal
$63
-
lb
$10,300 $3,000 $6,176
TOTAL IMPLEMENTED $21,110 $13,500 $196
7,620
kWh
$576
-
kW-mo/yr
$18 $9,150
-
MMBtu
$870
-
Tgal
- $10,300 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs