ITAC Assessment: IC0282
ITAC logo
ITAC Assessment: IC0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Thermoforming Products for Electronics, healthcare, food, and industrial purposes
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 40,000
ft2
Annual Production 2,824,061
lb
Production Hrs. Annual 4,576
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,939 1,620,480
kWh
Electricity Demand $91,094 4,508
kW-mo/yr
Electricity Fees $5,217 -
Natural Gas $12,206 1,127
MMBtu
Waste Disposal Costs
Water Usage $4,192 332
Tgal
TOTAL YEARLY COSTS $215,648
RECOMMENDED SAVINGS* $149,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,637 $3,994 $3,631
56,733
kWh
$3,006
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,144 $7,160 $2,820
44,067
kWh
$2,324
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,241 $4,067 $3,286
51,350
kWh
$1,954
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $132,518 $1,169,610 $67,050
1,047,655
kWh
$65,468
-
kW-mo/yr
TOTAL RECOMMENDED $149,540 $1,184,831 $76,787
1,199,805
kWh
$72,753
-
kW-mo/yr
TOTAL IMPLEMENTED $11,781 $11,154 $6,451
100,800
kWh
$5,330
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs