ITAC Assessment: IC0252
ITAC logo
ITAC Assessment: IC0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product RV Wheel Rims
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 300,000
ft2
Annual Production 420,000
units
Production Hrs. Annual 5,460
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,173 3,876,864
kWh
Electricity Demand $184,717 13,870
kW-mo/yr
Electricity Fees $(-123,759.0) -
Natural Gas $7,873 1,168
MMBtu
TOTAL YEARLY COSTS $375,004
RECOMMENDED SAVINGS* $27,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,022 $4,053 $739
9,600
kWh
$282
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,710 $5,524 $4,018
52,183
kWh
$1,692
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $16,762 $27,372 - - $16,762
04 2.4221: Install compressor air intakes in coolest locations $3,533 $230 $2,559
33,228
kWh
$974
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,026 $37,179 $7,316
95,011
kWh
$2,948
-
kW-mo/yr
$16,762
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs