ITAC Assessment: IC0244
ITAC logo
ITAC Assessment: IC0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Power Generation Parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 200,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,086 2,020,648
kWh
Electricity Demand $35,841 4,798
kW-mo/yr
Electricity Fees $25,007 -
Natural Gas $25,826 4,905
MMBtu
TOTAL YEARLY COSTS $200,760
RECOMMENDED SAVINGS* $12,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,228 $517 $1,884
33,638
kWh
$344
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,307 $4,150 $3,641
65,023
kWh
$665
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $732 $534 $732
13,070
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,190 $6,120 $5,504
98,842
kWh
$2,582
-
kW-mo/yr
$(-2,895.8)
-
MMBtu
TOTAL RECOMMENDED $12,457 $11,321 $11,762
210,573
kWh
$3,591
-
kW-mo/yr
$(-2,895.8)
-
MMBtu
TOTAL IMPLEMENTED $6,534 $4,667 $5,525
98,661
kWh
$1,009
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs