Assessment Year | 2020 |
---|---|
Principal Product | Trailer Axle Assembly |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
162,680
ft2
|
Annual Production | 538,000
ton
|
Production Hrs. Annual | 3,984
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $254,603 | 3,777,408 |
kWh
|
$0.067 |
Electricity Demand | $114,228 | 8,828 |
kW-mo/yr
|
$12.94 |
Electricity Fees | $46,153 | - |
|
- |
Natural Gas | $88,600 | 9,667 |
MMBtu
|
$9.16 |
TOTAL YEARLY COSTS | $503,584 | |||
RECOMMENDED SAVINGS* | $212,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $82,031 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,924 | $30,183 |
$36,182
536,817
kWh
|
$13,742
-
kW-mo/yr
|
- | - | |
02 | 3.6123: Burn wood by-products for heat | $42,806 | $9,522 | - | - |
$42,806
-
MMBtu
|
- | |
03 | 2.8114: Change rate schedules or other changes in utility service | $15,481 | - | - | - | - | $15,481 | |
04 | 2.7231: Use radiant heater for spot heating | $7,794 | $18,280 | - | - |
$7,794
-
MMBtu
|
- | |
05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $77,665 | $110,000 |
$28,318
420,159
kWh
|
$49,347
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,626 | $4,075 |
$12,000
178,042
kWh
|
$4,626
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,304 | $100 |
$1,663
24,668
kWh
|
$641
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $212,600 | $172,160 |
$78,162
1,159,686
kWh
|
$68,356
-
kW-mo/yr
|
$50,600
-
MMBtu
|
$15,481 | ||
TOTAL IMPLEMENTED | $82,031 | $34,258 |
$48,182
714,859
kWh
|
$18,368
-
kW-mo/yr
|
- | $15,481 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs