ITAC Assessment: IC0232
ITAC logo
ITAC Assessment: IC0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Honey Buns, Danishes, Donuts
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 490
Plant Area 130,000
ft2
Annual Production 73,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $745,697 18,247,401
kWh
Electricity Demand $502,158 31,579
kW-mo/yr
Electricity Fees $156,799 -
Natural Gas $590,888 113,781
MMBtu
Waste Disposal Costs
Water Usage $379,841 39,229
Tgal
TOTAL YEARLY COSTS $2,375,383
RECOMMENDED SAVINGS* $58,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,992 $2,233 $2,720
66,348
kWh
$1,272
-
kW-mo/yr
- -
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $10,592 $3,287 - - $10,592
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,953 $2,750 $9,138
222,880
kWh
$6,815
-
kW-mo/yr
- -
04 2.2113: Repair or replace steam traps $27,487 $3,700 - - $23,825
-
MMBtu
$3,662
-
Tgal
TOTAL RECOMMENDED $58,024 $11,970 $11,858
289,228
kWh
$8,087
-
kW-mo/yr
$34,417
-
MMBtu
$3,662
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs