ITAC Assessment: IC0224
ITAC logo
ITAC Assessment: IC0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Architectural Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 150,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,800
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,944 1,387,671
kWh
Electricity Demand $60,560 8,683
kW-mo/yr
Electricity Fees $38,583 -
Natural Gas $75,517 10,676
MMBtu
TOTAL YEARLY COSTS $237,604
RECOMMENDED SAVINGS* $41,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,919 $2,467 $1,166
25,687
kWh
$753
-
kW-mo/yr
- -
02 2.2113: Repair or replace steam traps $19,373 $57,850 - - $19,373
-
MMBtu
-
03 2.8114: Change rate schedules or other changes in utility service $6,406 - - - - $6,406
04 2.1221: Replace obsolete burners with more efficient ones $1,174 $5,784 - - $1,174
-
MMBtu
-
05 2.1224: Replace boiler $11,695 $66,600 - - $11,695
-
MMBtu
-
06 2.6218: Turn off equipment when not in use $110 - $110
2,418
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,156 $171 $993
21,864
kWh
$163
-
kW-mo/yr
- -
TOTAL RECOMMENDED $41,833 $132,872 $2,269
49,969
kWh
$916
-
kW-mo/yr
$32,242
-
MMBtu
$6,406
TOTAL IMPLEMENTED $21,304 $74,851 $1,276
28,105
kWh
$753
-
kW-mo/yr
$12,869
-
MMBtu
$6,406
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs