ITAC Assessment: IC0218
ITAC logo
ITAC Assessment: IC0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Food Processing, Meatballs and Steaks
NAICS 333241: Food Product Machinery Manufacturing
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 300,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,257
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,209,432 23,002,995
kWh
Electricity Demand $304,106 47,665
kW-mo/yr
Electricity Fees $197,819 -
Natural Gas $381,616 92,241
MMBtu
Waste Disposal Costs
Water Usage $503,285 63,264
Tgal
Water Disposal $156,874 62,894
Tgal
TOTAL YEARLY COSTS $2,753,132
RECOMMENDED SAVINGS* $114,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $33,997 $8,799 $26,547
504,704
kWh
$7,450
-
kW-mo/yr
- -
02 3.4156: Use flow control valves on equipment to optimize water use $63,690 $6,300 - - $19,192
-
MMBtu
$44,498
-
Tgal
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,151 $14,700 $6,404
121,799
kWh
$3,748
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $6,883 $8,244 - - $6,883
-
MMBtu
-
TOTAL RECOMMENDED $114,721 $38,043 $32,951
626,503
kWh
$11,198
-
kW-mo/yr
$26,075
-
MMBtu
$44,498
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs