ITAC Assessment: IC0215
ITAC logo
ITAC Assessment: IC0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wastewater Treatment Equipment and Systems Manufacturing
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 200,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,607
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,341 1,114,903
kWh
Electricity Demand $28,688 4,475
kW-mo/yr
Natural Gas $31,873 6,407
MMBtu
TOTAL YEARLY COSTS $160,902
RECOMMENDED SAVINGS* $32,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1224: Replace boiler $18,625 $2,250 - - $18,625
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $386 $2,006 $245
2,726
kWh
$141
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,317 $10,297 $7,042
78,276
kWh
$2,276
-
kW-mo/yr
- -
04 2.8114: Change rate schedules or other changes in utility service $4,090 - - - - $4,090
TOTAL RECOMMENDED $32,419 $14,553 $7,287
81,002
kWh
$2,417
-
kW-mo/yr
$18,625
-
MMBtu
$4,090
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs