ITAC Assessment: IC0211
ITAC logo
ITAC Assessment: IC0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pipe Coatings
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 75,000
ft2
Annual Production 3,500
thousand feet
Production Hrs. Annual 6,257
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,684 7,381,200
kWh
Electricity Demand $580,773 50,545
kW-mo/yr
Natural Gas $223,136 45,534
MMBtu
TOTAL YEARLY COSTS $1,320,593
RECOMMENDED SAVINGS* $79,828 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $5,999 $9,168 - - - $5,999
-
MMBtu
02 2.4133: Use most efficient type of electric motors $5,310 $18,709 $4,513
64,475
kWh
$797
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $25,768 $42,206 $14,358
205,111
kWh
$11,410
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,829 $4,500 $2,948
42,115
kWh
$2,881
-
kW-mo/yr
- -
05 2.8114: Change rate schedules or other changes in utility service $36,922 - - - $36,922 -
TOTAL RECOMMENDED $79,828 $74,583 $21,819
311,701
kWh
$15,088
-
kW-mo/yr
$36,922 $5,999
-
MMBtu
TOTAL IMPLEMENTED $73,829 $65,415 $21,819
311,701
kWh
$15,088
-
kW-mo/yr
$36,922 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs