*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wastewater Treatment Facility
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 5
Plant Area 576,602
ft2
Annual Production 6,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,389 4,457,644
kWh
Electricity Demand $47,975 8,215
kW-mo/yr
Natural Gas $35,723 8,004
MMBtu
TOTAL YEARLY COSTS $387,087
RECOMMENDED SAVINGS* $39,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,273 $4,939 $1,680
21,157
kWh
$593
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $4,222 $11,728 $4,170
52,525
kWh
$51
-
kW-mo/yr
03 2.6231: Utilize controls to operate equipment only when needed $32,608 $764 $32,608
410,686
kWh
-
TOTAL RECOMMENDED $39,103 $17,431 $38,459
484,368
kWh
$644
-
kW-mo/yr
TOTAL IMPLEMENTED $2,273 $4,939 $1,680
21,157
kWh
$593
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs