ITAC Assessment: IC0192
ITAC logo
ITAC Assessment: IC0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Containers
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2448: Wood Pallets and Skids
Sales Range $1
M
to 5
M
# of Employees 249
Plant Area 60,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,383 1,860,702
kWh
Electricity Demand $58,195 6,284
kW-mo/yr
Natural Gas $83,592 15,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,132 $2,264 $823
12,726
kWh
$309
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $32,171 $190,302 $23,245
352,262
kWh
$8,926
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $25,672 $128,355 $18,666
288,494
kWh
$7,006
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $408 $3,264 $408
6,301
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $407 - $407
6,269
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,650 $2,650 $2,650
40,964
kWh
- -
07 2.1133: Adjust burners for efficient operation $3,224 $1,612 - - $3,224
-
MMBtu
08 2.4322: Use or replace with energy efficient substitutes $133 - $111
1,700
kWh
$22
-
kW-mo/yr
-
TOTAL RECOMMENDED $65,797 $328,447 $46,310
708,716
kWh
$16,263
-
kW-mo/yr
$3,224
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs