ITAC Assessment: IC0191
ITAC logo
ITAC Assessment: IC0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Chocolate
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2066: Chocolate and Cocoa Products
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 200,000
ft2
Annual Production 90,000
ton
Production Hrs. Annual 6,096
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $837,176 17,403,032
kWh
Electricity Demand $37,935 32,112
kW-mo/yr
Natural Gas $302,136 63,066
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $34,161 $109,685 $24,949
519,763
kWh
$1,390
-
kW-mo/yr
- $7,822
02 2.2414: Use waste heat from hot flue gases to preheat $8,804 $57,885 - - $8,804
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $9,379 - - - $9,379
-
MMBtu
-
04 2.2511: Insulate bare equipment $6,711 $2,345 - - $6,711
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $190 $150 - - $190
-
MMBtu
-
06 2.2135: Repair and eliminate steam leaks $714 $200 - - $714
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $893 - $893
18,615
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,189 $690 $25,189
524,795
kWh
- - -
TOTAL RECOMMENDED $86,041 $170,955 $51,031
1,063,173
kWh
$1,390
-
kW-mo/yr
$25,798
-
MMBtu
$7,822
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs