ITAC Assessment: IC0171
ITAC logo
ITAC Assessment: IC0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Automotive Acoustical Products
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 131
Plant Area 145,000
ft2
Annual Production 6,800,000
pieces
Production Hrs. Annual 4,179
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,974 2,968,960
kWh
Electricity Demand $123,886 8,621
kW-mo/yr
Natural Gas $37,599 4,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,042 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,092

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,901 $6,914 $2,066
34,375
kWh
$1,594
-
kW-mo/yr
- $125 $116 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $91 $58 $10
165
kWh
$72
-
kW-mo/yr
- $8 - $1
03 2.7142: Utilize higher efficiency lamps and/or ballasts $26,223 $99,311 $15,889
264,802
kWh
$10,936
-
kW-mo/yr
- $1,331 - $(-1,933.0)
04 2.7135: Install occupancy sensors $517 $1,317 $267
4,578
kWh
$250
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,545 $345 $4,545
75,756
kWh
- - - - -
06 2.4133: Use most efficient type of electric motors $1,860 $5,879 $1,102
18,346
kWh
$758
-
kW-mo/yr
- - - -
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,143 $1,178 - - $2,143
-
MMBtu
- - -
08 2.2223: Enhance sensitivity of temperature control and cutoff $438 $1 - - $438
-
MMBtu
- - -
09 2.6211: Conserve energy by efficient use of vending machines $324 $1 $324
5,400
kWh
- - - - -
TOTAL RECOMMENDED $40,042 $115,004 $24,203
403,422
kWh
$13,610
-
kW-mo/yr
$2,581
-
MMBtu
$1,464 $116 $(-1,932.0)
TOTAL IMPLEMENTED $31,092 $99,657 $20,758
345,958
kWh
$10,936
-
kW-mo/yr
- $1,331 - $(-1,933.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs