Assessment Year | 2008 |
---|---|
Principal Product | Metal PLating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
96,000
ft2
|
Annual Production | 8,500,000
lb
|
Production Hrs. Annual | 4,208
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,047 | 468,173 |
kWh
|
$0.071 |
Electricity Demand | $7,995 | 1,264 |
kW-mo/yr
|
$6.33 |
Natural Gas | $10,489 | 1,101 |
MMBtu
|
$9.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $261 | $300 |
$72
1,016
kWh
|
$6
-
kW-mo/yr
|
- | - | $56 | $127 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156 | $102 |
$90
1,262
kWh
|
$25
-
kW-mo/yr
|
- | - | $43 | $(-2.0) | |
03 | 2.7135: Install occupancy sensors | $1,624 | $2,693 |
$1,290
18,178
kWh
|
$334
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $476 | $1,278 |
$381
5,376
kWh
|
$95
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.3137: Use power during off-peak periods | $55 | - |
$36
506
kWh
|
$19
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $1,124 | $913 |
$896
12,624
kWh
|
$228
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.6124: Burn waste oil for heat | $4,155 | - | - | - |
$4,155
-
MMBtu
|
- | - | - | |
08 | 3.4113: Treat and reuse rinse waters | $21,012 | $27,696 | - | - | - |
$21,012
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $28,863 | $32,982 |
$2,765
38,962
kWh
|
$707
-
kW-mo/yr
|
$4,155
-
MMBtu
|
$21,012
-
Tgal
|
$99 | $125 | ||
TOTAL IMPLEMENTED | $7,851 | $5,286 |
$2,765
38,962
kWh
|
$707
-
kW-mo/yr
|
$4,155
-
MMBtu
|
- | $99 | $125 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs