ITAC Assessment: IC0148
ITAC logo
ITAC Assessment: IC0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Metal PLating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 96,000
ft2
Annual Production 8,500,000
lb
Production Hrs. Annual 4,208
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,047 468,173
kWh
Electricity Demand $7,995 1,264
kW-mo/yr
Natural Gas $10,489 1,101
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $261 $300 $72
1,016
kWh
$6
-
kW-mo/yr
- - $56 $127
02 2.7142: Utilize higher efficiency lamps and/or ballasts $156 $102 $90
1,262
kWh
$25
-
kW-mo/yr
- - $43 $(-2.0)
03 2.7135: Install occupancy sensors $1,624 $2,693 $1,290
18,178
kWh
$334
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $476 $1,278 $381
5,376
kWh
$95
-
kW-mo/yr
- - - -
05 2.3137: Use power during off-peak periods $55 - $36
506
kWh
$19
-
kW-mo/yr
- - - -
06 2.2511: Insulate bare equipment $1,124 $913 $896
12,624
kWh
$228
-
kW-mo/yr
- - - -
07 3.6124: Burn waste oil for heat $4,155 - - - $4,155
-
MMBtu
- - -
08 3.4113: Treat and reuse rinse waters $21,012 $27,696 - - - $21,012
-
Tgal
- -
TOTAL RECOMMENDED $28,863 $32,982 $2,765
38,962
kWh
$707
-
kW-mo/yr
$4,155
-
MMBtu
$21,012
-
Tgal
$99 $125
TOTAL IMPLEMENTED $7,851 $5,286 $2,765
38,962
kWh
$707
-
kW-mo/yr
$4,155
-
MMBtu
- $99 $125
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs