Assessment Year | 2007 |
---|---|
Principal Product | fish and poultry |
NAICS | 311710: Seafood Product Preparation and Packaging |
SIC | 5142: Packaged Frozen Foods |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
18,255
ft2
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 2,520
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $95,338 | 2,140,800 |
kWh
|
$0.045 |
Electricity Demand | $56,907 | 7,647 |
kW-mo/yr
|
$7.44 |
Natural Gas | $39,019 | 4,140 |
MMBtu
|
$9.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,888 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,252 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $906 | - |
$906
20,133
kWh
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,349 | $3,349 | - |
$3,349
-
kW-mo/yr
|
- | - | - | |
03 | 2.3212: Optimize plant power factor | $8,296 | $19,530 |
$8,296
1,115
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,356 | $6,527 |
$823
18,563
kWh
|
$301
-
kW-mo/yr
|
- | $81 | $151 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $71 | $147 |
$23
508
kWh
|
$7
-
kW-mo/yr
|
- | $19 | $22 | |
06 | 2.4133: Use most efficient type of electric motors | $654 | $1,962 |
$304
6,747
kWh
|
$350
-
kW-mo/yr
|
- | - | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $396 | - | - | - |
$396
-
MMBtu
|
- | - | |
08 | 2.6211: Conserve energy by efficient use of vending machines | $860 | - |
$324
7,200
kWh
|
$536
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $15,888 | $31,515 |
$10,676
54,266
kWh
|
$4,543
-
kW-mo/yr
|
$396
-
MMBtu
|
$100 | $173 | ||
TOTAL IMPLEMENTED | $10,252 | $21,492 |
$9,506
27,995
kWh
|
$350
-
kW-mo/yr
|
$396
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs