ITAC Assessment: IC0132
ITAC logo
ITAC Assessment: IC0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product fish and poultry
NAICS 311710: Seafood Product Preparation and Packaging
SIC 5142: Packaged Frozen Foods
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 18,255
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 2,520
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,338 2,140,800
kWh
Electricity Demand $56,907 7,647
kW-mo/yr
Natural Gas $39,019 4,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,252

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $906 - $906
20,133
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,349 $3,349 - $3,349
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $8,296 $19,530 $8,296
1,115
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,356 $6,527 $823
18,563
kWh
$301
-
kW-mo/yr
- $81 $151
05 2.7142: Utilize higher efficiency lamps and/or ballasts $71 $147 $23
508
kWh
$7
-
kW-mo/yr
- $19 $22
06 2.4133: Use most efficient type of electric motors $654 $1,962 $304
6,747
kWh
$350
-
kW-mo/yr
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $396 - - - $396
-
MMBtu
- -
08 2.6211: Conserve energy by efficient use of vending machines $860 - $324
7,200
kWh
$536
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $15,888 $31,515 $10,676
54,266
kWh
$4,543
-
kW-mo/yr
$396
-
MMBtu
$100 $173
TOTAL IMPLEMENTED $10,252 $21,492 $9,506
27,995
kWh
$350
-
kW-mo/yr
$396
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs