Assessment Year | 2007 |
---|---|
Principal Product | Pork Products |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $50 M to 100M |
# of Employees | 226 |
Plant Area |
155,000
ft2
|
Annual Production | 80,000,000
lb
|
Production Hrs. Annual | 3,336
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $490,959 | 12,934,592 |
kWh
|
$0.038 |
Electricity Demand | $232,001 | 25,758 |
kW-mo/yr
|
$9.01 |
Natural Gas | $726,849 | 74,076 |
MMBtu
|
$9.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,349 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $103,349 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $14,659 | - | - | - | - |
$14,659
-
MMBtu
|
- | - | |
02 | 3.4114: Replace city water with recycled water via cooling tower | $800 | $440 |
$(-1,656.0)
(-43,580)
kWh
|
$(-1,216.0)
-
kW-mo/yr
|
- | - |
$3,672
-
Tgal
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $9,063 | $51,889 |
$5,994
157,749
kWh
|
$3,069
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $120 | $1,026 |
$120
3,149
kWh
|
- | - | - | - | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $36,459 | - | - | - | $36,459 | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,336 | $20,976 |
$2,720
71,582
kWh
|
$1,379
-
kW-mo/yr
|
- | - | - | $237 | |
07 | 2.2511: Insulate bare equipment | $3,818 | $886 | - | - | - |
$3,818
-
MMBtu
|
- | - | |
08 | 2.2135: Repair and eliminate steam leaks | $2,137 | $1,000 | - | - | - |
$2,092
-
MMBtu
|
$45
-
Tgal
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,282 | - | - | - | - |
$9,282
-
MMBtu
|
- | - | |
10 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $22,675 | $50,711 | - | - | - |
$22,675
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $103,349 | $126,928 |
$7,178
188,900
kWh
|
$3,232
-
kW-mo/yr
|
$36,459 |
$52,526
-
MMBtu
|
$3,717
-
Tgal
|
$237 | ||
TOTAL IMPLEMENTED | $103,349 | $126,928 |
$7,178
188,900
kWh
|
$3,232
-
kW-mo/yr
|
$36,459 |
$52,526
-
MMBtu
|
$3,717
-
Tgal
|
$237 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |