ITAC Assessment: IC0103
ITAC logo
ITAC Assessment: IC0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product High Quality Amorphous Boron
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 22,700
ft2
Annual Production 60,000
lb
Production Hrs. Annual 3,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,250 716,735
kWh
Natural Gas $55,781 7,077
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $12,792 $12,792 - $12,792
-
MMBtu
- -
02 2.2136: Install / repair insulation on steam lines $8,631 $4,680 - $8,631
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $2,344 $1,400 - $2,344
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,340 $300 $1,340
15,404
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $240 - $240
2,758
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,336 $941 $269
3,097
kWh
- $831 $236
07 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $330 $2,800 $330
3,793
kWh
- - -
08 2.7224: Reduce space conditioning during non-working hours $104 $256 - $104
-
MMBtu
- -
TOTAL RECOMMENDED $27,117 $23,169 $2,179
25,052
kWh
$23,871
-
MMBtu
$831 $236
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs