ITAC Assessment: IC0082
ITAC logo
ITAC Assessment: IC0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Alluminum Ingots / Sows
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 187,700
ft2
Annual Production 22,000
ton
Production Hrs. Annual 8,064
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,785 6,999,772
kWh
Electricity Demand $67,648 18,159
kW-mo/yr
Electricity Fees $225,408 -
Natural Gas $1,375,837 310,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $754,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $516,722

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.2314: Replace heat treating oven with more efficient unit $158,811 - - - $158,811
-
MMBtu
- -
02 2.2414: Use waste heat from hot flue gases to preheat $212,513 $1,533 $(-4,949.0)
(-81,129)
kWh
$(-450.0)
-
kW-mo/yr
$217,912
-
MMBtu
- -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $295,385 $90,783 $21,078
345,540
kWh
$1,950
-
kW-mo/yr
$373,157
-
MMBtu
- $(-100,800.0)
04 2.2531: Re-size charging openings or add movable cover or door $54,932 $8,421 - - $54,932
-
MMBtu
- -
05 2.4322: Use or replace with energy efficient substitutes $7,283 $1,450 - - $7,283
-
MMBtu
- -
06 2.4133: Use most efficient type of electric motors $24,495 $470,000 $21,575
353,753
kWh
$2,920
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $311 $282,150 $278
4,562
kWh
$33
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $516 $600,000 $271
4,441
kWh
$22
-
kW-mo/yr
- $81 $142
TOTAL RECOMMENDED $754,246 $1,454,337 $38,253
627,167
kWh
$4,475
-
kW-mo/yr
$812,095
-
MMBtu
$81 $(-100,658.0)
TOTAL IMPLEMENTED $516,722 $382,804 $21,356
350,102
kWh
$1,983
-
kW-mo/yr
$594,183
-
MMBtu
- $(-100,800.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs