ITAC Assessment: IC0077
ITAC logo
ITAC Assessment: IC0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Electrically Welded Structural Steel tube
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 302,252
ft2
Annual Production 95,000
ton
Production Hrs. Annual 3,824
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,335 4,408,435
kWh
Electricity Demand $214,549 29,238
kW-mo/yr
Electricity Fees $5,876 -
Natural Gas $102,093 10,983
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,066 $2,100 $1,202
37,568
kWh
$864
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,003 $199 $1,003
31,345
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $24,747 $74,730 $14,036
438,599
kWh
$9,875
-
kW-mo/yr
$(-1,327.0) $2,163
04 2.7142: Utilize higher efficiency lamps and/or ballasts $999 $4,888 $445
13,892
kWh
$456
-
kW-mo/yr
$1 $97
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,807 $2,963 $235
7,358
kWh
$74
-
kW-mo/yr
$650 $848
06 2.7135: Install occupancy sensors $743 $4,033 $620
19,317
kWh
$123
-
kW-mo/yr
- -
TOTAL RECOMMENDED $31,365 $88,913 $17,541
548,079
kWh
$11,392
-
kW-mo/yr
$(-676.0) $3,108
TOTAL IMPLEMENTED $4,876 $5,262 $2,440
76,271
kWh
$938
-
kW-mo/yr
$650 $848
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs