ITAC Assessment: IC0073
ITAC logo
ITAC Assessment: IC0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Cold Rolled Steel Strips and Bars
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 143,283
ft2
Annual Production 237,000,000
lb
Production Hrs. Annual 6,140
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $392,579 6,413,365
kWh
Electricity Demand $66,085 17,429
kW-mo/yr
Electricity Fees $11,304 -
Natural Gas $9,599 1,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,545 $944 $2,147
39,645
kWh
$398
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,854 - $3,489
57,195
kWh
$365
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,537 $4,300 $23,131
379,181
kWh
$2,406
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $46,841 $42,958 $36,906
605,017
kWh
$4,482
-
kW-mo/yr
$1,193 $4,260
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,672 $7,906 $1,169
19,131
kWh
$209
-
kW-mo/yr
$25 $269
06 2.7135: Install occupancy sensors $1,725 $4,016 $1,667
27,485
kWh
$58
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $690 $1,612 $329
5,396
kWh
$28
-
kW-mo/yr
$134 $199
08 2.6218: Turn off equipment when not in use $12,606 - $12,606
206,662
kWh
- - -
TOTAL RECOMMENDED $95,470 $61,736 $81,444
1,339,712
kWh
$7,946
-
kW-mo/yr
$1,352 $4,728
TOTAL IMPLEMENTED $95,470 $61,736 $81,444
1,339,712
kWh
$7,946
-
kW-mo/yr
$1,352 $4,728
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs