ITAC Assessment: IC0063
ITAC logo
ITAC Assessment: IC0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Ground Engaging Tools
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $100
M
to 500
M
# of Employees 254
Plant Area 246,528
ft2
Annual Production 42,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,027 5,606,340
kWh
Electricity Demand $123,648 12,813
kW-mo/yr
Electricity Fees $39,330 -
Natural Gas $1,122,521 194,691
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,076

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $41,654 $50,275 $24,377
641,486
kWh
$17,219
-
kW-mo/yr
- $(-443.0) $501
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,141 $4,800 $5,941
156,375
kWh
$4,200
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $5,935 - $3,479
91,510
kWh
$2,456
-
kW-mo/yr
- - -
04 3.1191: Change procedures / equipment / operating conditions $21,835 $62,344 $8,407
221,246
kWh
$13,428
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,633 $15,965 $1,334
35,102
kWh
$3,299
-
kW-mo/yr
- - -
06 2.5111: Convert from indirect to direct fired systems $36,807 $250,000 - - $36,807
-
MMBtu
- -
07 2.5111: Convert from indirect to direct fired systems $7,351 $24,365 - - $7,351
-
MMBtu
- -
TOTAL RECOMMENDED $128,356 $407,749 $43,538
1,145,719
kWh
$40,602
-
kW-mo/yr
$44,158
-
MMBtu
$(-443.0) $501
TOTAL IMPLEMENTED $16,076 $4,800 $9,420
247,885
kWh
$6,656
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs