ITAC Assessment: IC0058
ITAC logo
ITAC Assessment: IC0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Active Pharmaceutical Ingredients
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 82,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,300 1,695,595
kWh
Electricity Demand $25,717 4,210
kW-mo/yr
Electricity Fees $686 -
Natural Gas $79,039 9,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,475 $9,774 $2,757
42,481
kWh
$419
-
kW-mo/yr
- - $10 $289 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,668 $1,551 $92
1,419
kWh
$7
-
kW-mo/yr
- - $937 $1,632 -
03 2.7135: Install occupancy sensors $1,137 $1,948 $1,102
16,977
kWh
$35
-
kW-mo/yr
- - - - -
04 2.2136: Install / repair insulation on steam lines $1,010 $4,100 - - $1,010
-
MMBtu
- - - -
05 2.4322: Use or replace with energy efficient substitutes $6,017 $12,784 - - - $1,157
-
Tgal
- - $4,860
-
Tgal
TOTAL RECOMMENDED $14,307 $30,157 $3,951
60,877
kWh
$461
-
kW-mo/yr
$1,010
-
MMBtu
$1,157
-
Tgal
$947 $1,921 $4,860
-
Tgal
TOTAL IMPLEMENTED $12,160 $24,109 $2,849
43,900
kWh
$426
-
kW-mo/yr
- $1,157
-
Tgal
$947 $1,921 $4,860
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs