Assessment Year | 2003 |
---|---|
Principal Product | Active Pharmaceutical Ingredients |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
82,000
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $95,300 | 1,695,595 |
kWh
|
$0.056 |
Electricity Demand | $25,717 | 4,210 |
kW-mo/yr
|
$6.11 |
Electricity Fees | $686 | - |
|
- |
Natural Gas | $79,039 | 9,603 |
MMBtu
|
$8.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,307 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,160 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,475 | $9,774 |
$2,757
42,481
kWh
|
$419
-
kW-mo/yr
|
- | - | $10 | $289 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,668 | $1,551 |
$92
1,419
kWh
|
$7
-
kW-mo/yr
|
- | - | $937 | $1,632 | - | |
03 | 2.7135: Install occupancy sensors | $1,137 | $1,948 |
$1,102
16,977
kWh
|
$35
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $1,010 | $4,100 | - | - |
$1,010
-
MMBtu
|
- | - | - | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $6,017 | $12,784 | - | - | - |
$1,157
-
Tgal
|
- | - |
$4,860
-
Tgal
|
|
TOTAL RECOMMENDED | $14,307 | $30,157 |
$3,951
60,877
kWh
|
$461
-
kW-mo/yr
|
$1,010
-
MMBtu
|
$1,157
-
Tgal
|
$947 | $1,921 |
$4,860
-
Tgal
|
||
TOTAL IMPLEMENTED | $12,160 | $24,109 |
$2,849
43,900
kWh
|
$426
-
kW-mo/yr
|
- |
$1,157
-
Tgal
|
$947 | $1,921 |
$4,860
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs