ITAC Assessment: IC0030
ITAC logo
ITAC Assessment: IC0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Public Building and Related Furniture
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 217,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 4,845
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,683 2,286,849
kWh
Electricity Demand $66,398 5,388
kW-mo/yr
Electricity Fees $21,150 -
Natural Gas $123,142 12,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $146,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,316 $1,400 $1,296
33,181
kWh
$1,020
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,674 $27,188 $2,740
70,258
kWh
$1,020
-
kW-mo/yr
$106 - $808
03 2.7135: Install occupancy sensors $2,438 $1,225 $2,108
54,047
kWh
$330
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,602 $25,370 $3,868
99,167
kWh
$3,026
-
kW-mo/yr
$(-250.0) - $(-42.0)
05 4.426: Modify workload $132,950 $36,600 - - $78,500 $54,450 -
06 4.111: Add equipment/ operators to reduce production bottleneck $9,840 $250 - - $9,840 - -
TOTAL RECOMMENDED $158,820 $92,033 $10,012
256,653
kWh
$5,396
-
kW-mo/yr
$88,196 $54,450 $766
TOTAL IMPLEMENTED $146,542 $90,558 $7,904
202,606
kWh
$5,066
-
kW-mo/yr
$78,356 $54,450 $766
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs