Assessment Year | 2002 |
---|---|
Principal Product | Non-Clay Refractories |
NAICS |
n/a
|
SIC | 3297: Nonclay Refractories |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
56,000
ft2
|
Annual Production | 875,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,972 | 964,920 |
kWh
|
$0.028 |
Electricity Demand | $49,385 | 4,050 |
kW-mo/yr
|
$12.19 |
Electricity Fees | $4,160 | - |
|
- |
Natural Gas | $66,005 | 20,011 |
MMBtu
|
$3.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,006 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,084 | $1,600 |
$963
30,132
kWh
|
$2,121
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $624 | - |
$174
5,431
kWh
|
$450
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,369 | $4,933 |
$492
15,375
kWh
|
$721
-
kW-mo/yr
|
$120 | - | $36 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,993 | $26,387 |
$1,370
42,806
kWh
|
$3,011
-
kW-mo/yr
|
$112 | - | $500 | |
05 | 2.7135: Install occupancy sensors | $746 | $1,370 |
$565
17,657
kWh
|
$181
-
kW-mo/yr
|
- | - | - | |
06 | 4.426: Modify workload | $29,190 | $29,765 | - | - | $11,430 | $17,760 | - | |
TOTAL RECOMMENDED | $40,006 | $64,055 |
$3,564
111,401
kWh
|
$6,484
-
kW-mo/yr
|
$11,662 | $17,760 | $536 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs