| Assessment Year | 2001 |
|---|---|
| Principal Product | Stamped Metal Parts |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 47 |
| Plant Area |
36,500
ft2
|
| Annual Production | 50,000,000
pieces
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $17,553 | 422,649 |
kWh
|
$0.042 |
| Electricity Demand | $17,949 | 1,447 |
kW-mo/yr
|
$12.40 |
| Electricity Fees | $5,589 | - |
|
- |
| Natural Gas | $17,934 | 1,870 |
MMBtu
|
$9.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,742 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,251 | $12,135 |
$1,836
34,003
kWh
|
$1,193
-
kW-mo/yr
|
- | - | - | $222 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,542 | $2,500 |
$1,578
29,242
kWh
|
$964
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.6232: Install set-back timers | $5,334 | $820 | - | - |
$5,334
-
MMBtu
|
- | - | - | |
| 04 | 2.3191: Use demand controller or load shedder | $1,800 | $3,280 | - |
$1,800
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 4.515: Install shelves / racks to utilize unused space | $6,502 | $6,300 | - | - | - | $6,502 | - | - | |
| 06 | 4.447: Automate payroll system | $15,200 | $4,900 | - | - | - | $8,300 | $6,900 | - | |
| TOTAL RECOMMENDED | $34,629 | $29,935 |
$3,414
63,245
kWh
|
$3,957
-
kW-mo/yr
|
$5,334
-
MMBtu
|
$14,802 | $6,900 | $222 | ||
| TOTAL IMPLEMENTED | $17,742 | $7,400 |
$1,578
29,242
kWh
|
$964
-
kW-mo/yr
|
- | $8,300 | $6,900 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs