ITAC Assessment: IC0022
ITAC logo
ITAC Assessment: IC0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Stamped Metal Parts
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 36,500
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,553 422,649
kWh
Electricity Demand $17,949 1,447
kW-mo/yr
Electricity Fees $5,589 -
Natural Gas $17,934 1,870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,251 $12,135 $1,836
34,003
kWh
$1,193
-
kW-mo/yr
- - - $222
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,542 $2,500 $1,578
29,242
kWh
$964
-
kW-mo/yr
- - - -
03 2.6232: Install set-back timers $5,334 $820 - - $5,334
-
MMBtu
- - -
04 2.3191: Use demand controller or load shedder $1,800 $3,280 - $1,800
-
kW-mo/yr
- - - -
05 4.515: Install shelves / racks to utilize unused space $6,502 $6,300 - - - $6,502 - -
06 4.447: Automate payroll system $15,200 $4,900 - - - $8,300 $6,900 -
TOTAL RECOMMENDED $34,629 $29,935 $3,414
63,245
kWh
$3,957
-
kW-mo/yr
$5,334
-
MMBtu
$14,802 $6,900 $222
TOTAL IMPLEMENTED $17,742 $7,400 $1,578
29,242
kWh
$964
-
kW-mo/yr
- $8,300 $6,900 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs