ITAC Assessment: IC0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Plastic Toys
NAICS
n/a
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $50
M
to 100
M
# of Employees 360
Plant Area 354,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,125 11,542,224
kWh
Electricity Demand $270,307 21,215
kW-mo/yr
Electricity Fees $91,051 -
Natural Gas $46,539 8,455
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,091 $1,700 $4,098
110,757
kWh
$2,993
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,836 $20,599 $2,603
70,345
kWh
$1,268
-
kW-mo/yr
$699 - $(-734.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $471 $64
1,717
kWh
$31
-
kW-mo/yr
$135 - $42 -
04 2.3191: Use demand controller or load shedder $28,000 $2,737 - $28,000
-
kW-mo/yr
- - - -
05 4.426: Modify workload $117,000 $57,100 - - $115,900 $1,100 - -
06 4.513: Re-arrange equipment layout to reduce labor costs $9,945 $40 - - - - - $9,945
TOTAL RECOMMENDED $166,144 $82,647 $6,765
182,819
kWh
$32,292
-
kW-mo/yr
$116,734 $1,100 $(-692.0) $9,945
TOTAL IMPLEMENTED $45,308 $4,948 $4,162
112,474
kWh
$31,024
-
kW-mo/yr
$135 - $42 $9,945
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs