Assessment Year | 2001 |
---|---|
Principal Product | Assembly of Drive Axels |
NAICS |
n/a
|
SIC | 3799: Transportation Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 245 |
Plant Area |
160,590
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 5,100
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $116,799 | 2,899,462 |
kWh
|
$0.040 |
Electricity Demand | $103,389 | 8,368 |
kW-mo/yr
|
$12.36 |
Electricity Fees | $24,737 | - |
|
- |
Natural Gas | $38,919 | 7,463 |
MMBtu
|
$5.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $630,248 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,796 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,962 | $1,500 |
$1,148
27,989
kWh
|
$814
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,503 | $92,040 | n/a |
$15,527
378,706
kWh
|
$10,976
-
kW-mo/yr
|
- | - | - | - | - | - |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $522 | $1,677 |
$110
2,681
kWh
|
$45
-
kW-mo/yr
|
- | - | - | $248 | - | $119 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,569 | $7,461 |
$903
22,020
kWh
|
$640
-
kW-mo/yr
|
- | - | - | $26 | - | - | |
05 | 2.7135: Install occupancy sensors | $1,359 | $2,516 |
$1,196
29,163
kWh
|
$163
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $369 | $1,551 |
$138
3,367
kWh
|
$231
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.2511: Insulate bare equipment | $222 | $832 | - | - | - |
$222
-
MMBtu
|
- | - | - | - | |
08 | 2.2511: Insulate bare equipment | $652 | $2,670 | - | - | - |
$652
-
MMBtu
|
- | - | - | - | |
09 | 2.2511: Insulate bare equipment | $128 | $370 | - | - | - |
$128
-
MMBtu
|
- | - | - | - | |
10 | 2.3132: Recharge batteries on during off-peak demand periods | $162 | - | - | - | $162 | - | - | - | - | - | |
11 | 3.5316: Contract a wood pallet recycling company | $28,000 | $5,300 | - | - | - | - |
$28,000
-
lb
|
- | - | - | |
12 | 4.447: Automate payroll system | $84,800 | $6,670 | - | - | - | - | - | $69,800 | $15,000 | - | |
13 | 4.426: Modify workload | $484,000 | $66,100 | - | - | - | - | - | $480,000 | $4,000 | - | |
TOTAL RECOMMENDED | $630,248 | $188,687 |
$19,022
463,926
kWh
|
$12,869
-
kW-mo/yr
|
$162 |
$1,002
-
MMBtu
|
$28,000
-
lb
|
$550,074 | $19,000 | $119 | ||
TOTAL IMPLEMENTED | $33,796 | $19,286 |
$3,357
81,853
kWh
|
$1,662
-
kW-mo/yr
|
$162 |
$222
-
MMBtu
|
$28,000
-
lb
|
$274 | - | $119 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs