ITAC Assessment: IC0005
ITAC logo
ITAC Assessment: IC0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Testing Equipment
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 130,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 5,100
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,526 2,321,521
kWh
Electricity Demand $83,304 6,756
kW-mo/yr
Electricity Fees $32,039 -
Natural Gas $31,380 4,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $505,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,229

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,125 $2,600 $5,416
127,732
kWh
$3,709
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $390 $491 $222
5,232
kWh
$168
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $29,971 $88,900 n/a $14,237
335,779
kWh
$15,734
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $22,773 $4,940 $9,549
225,206
kWh
$13,224
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $941 $2,995 $365
8,620
kWh
$146
-
kW-mo/yr
$323 - $107
06 4.652: Replace existing equipment with more suitable substitutes $102,000 $15,000 - - $75,000 $27,000 -
07 4.322: Eliminate old stock and modify inventory control $340,000 $8,500 - - - $340,000 -
TOTAL RECOMMENDED $505,200 $123,426 $29,789
702,569
kWh
$32,981
-
kW-mo/yr
$75,323 $367,000 $107
TOTAL IMPLEMENTED $33,229 $11,026 $15,552
366,790
kWh
$17,247
-
kW-mo/yr
$323 - $107
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs