| Assessment Year | 2001 |
|---|---|
| Principal Product | Testing Equipment |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
130,000
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 5,100
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $98,526 | 2,321,521 |
kWh
|
$0.042 |
| Electricity Demand | $83,304 | 6,756 |
kW-mo/yr
|
$12.33 |
| Electricity Fees | $32,039 | - |
|
- |
| Natural Gas | $31,380 | 4,845 |
MMBtu
|
$6.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $505,200 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,229 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,125 | $2,600 |
$5,416
127,732
kWh
|
$3,709
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $390 | $491 |
$222
5,232
kWh
|
$168
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,971 | $88,900 | n/a |
$14,237
335,779
kWh
|
$15,734
-
kW-mo/yr
|
- | - | - |
| 04 | 2.7135: Install occupancy sensors | $22,773 | $4,940 |
$9,549
225,206
kWh
|
$13,224
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $941 | $2,995 |
$365
8,620
kWh
|
$146
-
kW-mo/yr
|
$323 | - | $107 | |
| 06 | 4.652: Replace existing equipment with more suitable substitutes | $102,000 | $15,000 | - | - | $75,000 | $27,000 | - | |
| 07 | 4.322: Eliminate old stock and modify inventory control | $340,000 | $8,500 | - | - | - | $340,000 | - | |
| TOTAL RECOMMENDED | $505,200 | $123,426 |
$29,789
702,569
kWh
|
$32,981
-
kW-mo/yr
|
$75,323 | $367,000 | $107 | ||
| TOTAL IMPLEMENTED | $33,229 | $11,026 |
$15,552
366,790
kWh
|
$17,247
-
kW-mo/yr
|
$323 | - | $107 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs