ITAC Assessment: IA0517
ITAC logo
ITAC Assessment: IA0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Kitchen Cabinets
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 160,000
ft2
Annual Production 27,000
pieces
Production Hrs. Annual 1,938
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,649 2,895,800
kWh
Electricity Demand $210,679 14,180
kW-mo/yr
Electricity Fees $3,017 -
Natural Gas $104,019 21,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,210 $775 $641
18,639
kWh
$1,569
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,892 $693 $624
17,898
kWh
$2,268
-
kW-mo/yr
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,269 $4,025 $1,269
39,070
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $889 $35 $262
7,497
kWh
$627
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $609 $3,115 $179
5,141
kWh
$430
-
kW-mo/yr
-
06 2.7226: Use computer programs to optimize hvac performance $19,006 $15,000 $1,673
47,937
kWh
$4,011
-
kW-mo/yr
$13,322
-
MMBtu
TOTAL RECOMMENDED $26,875 $23,643 $4,648
136,182
kWh
$8,905
-
kW-mo/yr
$13,322
-
MMBtu
TOTAL IMPLEMENTED $5,102 $1,468 $1,265
36,537
kWh
$3,837
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs