Assessment Year | 2013 |
---|---|
Principal Product | automotive hose |
NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
SIC | 3052: Rubber and Plastics Hose and Belting |
Sales Range | $50 M to 100M |
# of Employees | 240 |
Plant Area |
165,700
ft2
|
Annual Production | 95,000
thousand feet
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $547,086 | 8,755,560 |
kWh
|
$0.062 |
Electricity Demand | $144,572 | 19,276 |
kW-mo/yr
|
$7.50 |
Electricity Fees | $4,104 | - |
|
- |
Natural Gas | $176,175 | 36,708 |
MMBtu
|
$4.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,477 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,420 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7229: Air condition only space necessary | $4,234 | $2,800 |
$4,234
67,961
kWh
|
- | - | |
02 | 2.2522: Isolate hot or cold equipment | $705 | $840 | - | - |
$705
-
MMBtu
|
|
03 | 2.7135: Install occupancy sensors | $819 | $2,680 |
$819
13,146
kWh
|
- | - | |
04 | 2.1213: Direct warmest air to combustion intake | $486 | $334 | - | - |
$486
-
MMBtu
|
|
05 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,018 | $22,500 | - | - |
$5,018
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,728 | $2,575 |
$1,728
27,731
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $1,367 | $1,800 |
$1,129
18,121
kWh
|
$238
-
kW-mo/yr
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $6,771 | $650 |
$5,592
89,781
kWh
|
$1,179
-
kW-mo/yr
|
- | |
09 | 2.4239: Eliminate or reduce compressed air usage | $1,349 | $1,200 |
$1,349
21,648
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,477 | $35,379 |
$14,851
238,388
kWh
|
$1,417
-
kW-mo/yr
|
$6,209
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,420 | $7,280 |
$6,182
99,228
kWh
|
$238
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs