Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fan clutches
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 188
Plant Area 155,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 5,980
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,169 7,010,180
kWh
Electricity Demand $148,253 16,884
kW-mo/yr
LPG $45,951 3,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,524 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7141: Lower light fixtures in high ceiling areas $19,923 $46,094 $14,544
306,176
kWh
$5,379
-
kW-mo/yr
-
02 2.7141: Lower light fixtures in high ceiling areas $1,463 $2,391 $1,068
22,485
kWh
$395
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $4,575 $3,675 $3,340
70,325
kWh
$1,235
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,214 $1,720 $3,077
64,774
kWh
$1,137
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,881 $4,000 $8,681
182,505
kWh
$3,200
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $1,468 $1,500 - - $1,468
-
MMBtu
07 2.6218: Turn off equipment when not in use $7,000 $7,560 $7,000
147,526
kWh
- -
TOTAL RECOMMENDED $50,524 $66,940 $37,710
793,791
kWh
$11,346
-
kW-mo/yr
$1,468
-
MMBtu
TOTAL IMPLEMENTED $25,605 $49,314 $17,621
370,950
kWh
$6,516
-
kW-mo/yr
$1,468
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs