Assessment Year | 2013 |
---|---|
Principal Product | Fan clutches |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 188 |
Plant Area |
155,000
ft2
|
Annual Production | 250,000
pieces
|
Production Hrs. Annual | 5,980
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $333,169 | 7,010,180 |
kWh
|
$0.048 |
Electricity Demand | $148,253 | 16,884 |
kW-mo/yr
|
$8.78 |
LPG | $45,951 | 3,320 |
MMBtu
|
$13.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,524 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,605 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.7141: Lower light fixtures in high ceiling areas | $19,923 | $46,094 |
$14,544
306,176
kWh
|
$5,379
-
kW-mo/yr
|
- | |
02 | 2.7141: Lower light fixtures in high ceiling areas | $1,463 | $2,391 |
$1,068
22,485
kWh
|
$395
-
kW-mo/yr
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $4,575 | $3,675 |
$3,340
70,325
kWh
|
$1,235
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,214 | $1,720 |
$3,077
64,774
kWh
|
$1,137
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,881 | $4,000 |
$8,681
182,505
kWh
|
$3,200
-
kW-mo/yr
|
- | |
06 | 2.2437: Recover waste heat from equipment | $1,468 | $1,500 | - | - |
$1,468
-
MMBtu
|
|
07 | 2.6218: Turn off equipment when not in use | $7,000 | $7,560 |
$7,000
147,526
kWh
|
- | - | |
TOTAL RECOMMENDED | $50,524 | $66,940 |
$37,710
793,791
kWh
|
$11,346
-
kW-mo/yr
|
$1,468
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,605 | $49,314 |
$17,621
370,950
kWh
|
$6,516
-
kW-mo/yr
|
$1,468
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs