ITAC Assessment: IA0486
ITAC logo
ITAC Assessment: IA0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Pre painted metal building components
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 85,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,212 638,360
kWh
Electricity Demand $25,202 3,962
kW-mo/yr
Natural Gas $29,720 5,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $904 $2,721 $521
10,646
kWh
$383
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $415 $350 - - $415
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $362 $420 $207
4,232
kWh
$155
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $462 $448 $266
5,448
kWh
$196
-
kW-mo/yr
- -
05 4.111: Add equipment/ operators to reduce production bottleneck $8,985 $8,186 $36
744
kWh
- $199
-
MMBtu
$8,750
TOTAL RECOMMENDED $11,128 $12,125 $1,030
21,070
kWh
$734
-
kW-mo/yr
$614
-
MMBtu
$8,750
TOTAL IMPLEMENTED $10,224 $9,404 $509
10,424
kWh
$351
-
kW-mo/yr
$614
-
MMBtu
$8,750
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs