ITAC Assessment: IA0483
ITAC logo
ITAC Assessment: IA0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Park Equipment
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 154,500
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 2,470
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,701 918,680
kWh
Electricity Demand $37,442 6,242
kW-mo/yr
Natural Gas $30,183 3,835
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,739 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,624 $4,936 $977
20,682
kWh
$647
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,696 $69,009 $6,016
127,452
kWh
$3,680
-
kW-mo/yr
03 2.7135: Install occupancy sensors $290 $1,110 $290
6,152
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $633 $229 $401
8,476
kWh
$232
-
kW-mo/yr
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $496 $1,810 $275
5,824
kWh
$221
-
kW-mo/yr
TOTAL RECOMMENDED $12,739 $77,094 $7,959
168,586
kWh
$4,780
-
kW-mo/yr
TOTAL IMPLEMENTED $10,329 $69,238 $6,417
135,928
kWh
$3,912
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs