Assessment Year | 2012 |
---|---|
Principal Product | Iron Casting |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
43,600
ft2
|
Annual Production | 2,600
ton
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,338 | 996,550 |
kWh
|
$0.046 |
Electricity Demand | $55,943 | 3,920 |
kW-mo/yr
|
$14.27 |
Electricity Fees | $7,137 | - |
|
- |
Natural Gas | $46,933 | 8,899 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,981 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,512 | $286 |
$1,913
41,149
kWh
|
$1,599
-
kW-mo/yr
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,387 | $5,172 |
$736
15,808
kWh
|
$651
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,272 | $3,137 |
$988
21,348
kWh
|
$1,284
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,440 | $240 | - | - |
$2,440
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $843 | $537 | - | - |
$843
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $5,081 | $6,000 | - | - |
$5,081
-
MMBtu
|
|
07 | 2.2442: Preheat combustion air with waste heat | $717 | $200 | - | - |
$717
-
MMBtu
|
|
08 | 2.7135: Install occupancy sensors | $402 | $557 |
$402
8,661
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,810 | $1,912 |
$731
15,725
kWh
|
$1,079
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $18,464 | $18,041 |
$4,770
102,691
kWh
|
$4,613
-
kW-mo/yr
|
$9,081
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,981 | $10,507 |
$4,368
94,030
kWh
|
$4,613
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs