ITAC Assessment: IA0477
ITAC logo
ITAC Assessment: IA0477
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Boat Trailers
NAICS 336214: Travel Trailer and Camper Manufacturing
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 241
Plant Area 300,000
ft2
Annual Production 280,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,981 5,202,511
kWh
Electricity Demand $47,047 14,030
kW-mo/yr
Natural Gas $172,074 31,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,752 $52,500 $24,323
726,058
kWh
$429
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $8,202 $609 $8,036
239,890
kWh
$166
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $436 $719 $436
13,064
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,175 $5,087 $2,759
82,368
kWh
$1,416
-
kW-mo/yr
-
05 2.7224: Reduce space conditioning during non-working hours $1,536 $18 - - $1,536
-
MMBtu
06 2.4239: Eliminate or reduce compressed air usage $1,869 $206 $1,652
49,327
kWh
$217
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $1,407 $630 - - $1,407
-
MMBtu
08 2.6218: Turn off equipment when not in use $431 $153 $431
12,870
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $762 $3,574 $622
18,573
kWh
$140
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,570 $63,496 $38,259
1,142,150
kWh
$2,368
-
kW-mo/yr
$2,943
-
MMBtu
TOTAL IMPLEMENTED $24,752 $52,500 $24,323
726,058
kWh
$429
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs