ITAC Assessment: IA0473
ITAC logo
ITAC Assessment: IA0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Transport Temperature Control Systems
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 270
Plant Area 234,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,247 4,177,200
kWh
Electricity Demand $86,162 12,300
kW-mo/yr
Natural Gas $126,397 23,102
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $695 $1,100 - - $695
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,500 $105 $2,831
69,907
kWh
$669
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,238 $4,669 $1,810
44,676
kWh
$428
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,472 $426 $1,472
36,329
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $615 $1,273 $497
12,264
kWh
$118
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $954 $350
8,656
kWh
$118
-
kW-mo/yr
-
TOTAL RECOMMENDED $8,988 $8,527 $6,960
171,832
kWh
$1,333
-
kW-mo/yr
$695
-
MMBtu
TOTAL IMPLEMENTED $6,353 $6,047 $5,138
126,847
kWh
$1,215
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs