Assessment Year | 2010 |
---|---|
Principal Product | Pure Gypsum and Limestone |
NAICS | 327410: Lime Manufacturing |
SIC | 3274: Lime |
Sales Range | $10 M to 50M |
# of Employees | 36 |
Plant Area |
35,000
ft2
|
Annual Production | 100,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $264,279 | 6,070,003 |
kWh
|
$0.044 |
Electricity Demand | $170,222 | 12,900 |
kW-mo/yr
|
$13.20 |
Natural Gas | $791,141 | 146,968 |
MMBtu
|
$5.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,874 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,544 | $16,376 |
$7,632
174,626
kWh
|
$4,912
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,332 | $3,835 |
$1,420
32,485
kWh
|
$912
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,800 | $1,799 |
$1,049
23,972
kWh
|
$1,751
-
kW-mo/yr
|
|
04 | 2.7135: Install occupancy sensors | $385 | $717 |
$385
8,799
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $657 | $50 |
$437
10,008
kWh
|
$220
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $565 | $50 |
$358
8,175
kWh
|
$207
-
kW-mo/yr
|
|
07 | 2.4133: Use most efficient type of electric motors | $1,067 | $2,774 |
$710
16,236
kWh
|
$357
-
kW-mo/yr
|
|
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,524 | - |
$8,338
190,800
kWh
|
$4,186
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $32,874 | $25,601 |
$20,329
465,101
kWh
|
$12,545
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $29,090 | $18,275 |
$17,814
407,581
kWh
|
$11,276
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs