ITAC Assessment: IA0442
ITAC logo
ITAC Assessment: IA0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Dry sausage products
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 151,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,468 13,522,240
kWh
Electricity Demand $190,060 25,344
kW-mo/yr
Electricity Fees $36,894 -
Natural Gas $817,149 90,737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,396 $1,012 $953
30,763
kWh
$443
-
kW-mo/yr
02 2.7135: Install occupancy sensors $1,053 $1,195 $1,053
33,985
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,623 $25 $993
32,033
kWh
$630
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,409 $1,149 $1,361
43,931
kWh
$48
-
kW-mo/yr
TOTAL RECOMMENDED $5,481 $3,381 $4,360
140,712
kWh
$1,121
-
kW-mo/yr
TOTAL IMPLEMENTED $1,623 $25 $993
32,033
kWh
$630
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs