ITAC Assessment: IA0423
ITAC logo
ITAC Assessment: IA0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product brass and aluminum sand castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 32,000
ft2
Annual Production 675,000
lb
Production Hrs. Annual 2,500
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,274 1,424,504
kWh
Electricity Demand $57,212 11,112
kW-mo/yr
Electricity Fees $16,202 -
Natural Gas $79,293 8,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $2,458 $617 $1,606
34,473
kWh
$852
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $443 $25 $288
6,250
kWh
$155
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $1,639 $150 $76
1,632
kWh
- $1,563
-
MMBtu
04 2.4133: Use most efficient type of electric motors $516 $86 $337
7,239
kWh
$179
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $697 $1,001 $697
14,987
kWh
- -
06 2.7232: Replace existing hvac unit with high efficiency model $11,415 $18,345 - - $11,415
-
MMBtu
TOTAL RECOMMENDED $17,168 $20,224 $3,004
64,581
kWh
$1,186
-
kW-mo/yr
$12,978
-
MMBtu
TOTAL IMPLEMENTED $3,417 $728 $2,231
47,962
kWh
$1,186
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs