ITAC Assessment: IA0419
ITAC logo
ITAC Assessment: IA0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Mufflers
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 227,560
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 3,406
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,313 6,035,334
kWh
Electricity Demand $136,661 15,756
kW-mo/yr
Electricity Fees $29,726 -
Natural Gas $262,466 27,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,849

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $4,302 $1,140 - - - $4,302
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $678 $25 $375
10,218
kWh
$303
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,055 $500 $2,798
76,226
kWh
$2,257
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $1,431 $174 $793
21,507
kWh
$638
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $758 $1,001 $758
20,651
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,515 $7,460 $2,499
68,087
kWh
$2,016
-
kW-mo/yr
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $5,450 $1,200 $5,450
148,500
kWh
- - -
08 2.3212: Optimize plant power factor $19,032 $19,062 - - $19,032 -
09 2.2437: Recover waste heat from equipment $2,583 $3,300 - - - $2,583
-
MMBtu
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,325 $800 $1,287
35,049
kWh
$1,038
-
kW-mo/yr
- -
TOTAL RECOMMENDED $46,129 $34,662 $13,960
380,238
kWh
$6,252
-
kW-mo/yr
$19,032 $6,885
-
MMBtu
TOTAL IMPLEMENTED $16,849 $6,826 $10,668
290,644
kWh
$3,598
-
kW-mo/yr
- $2,583
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs