ITAC Assessment: IA0418
ITAC logo
ITAC Assessment: IA0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Cabmate
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 100,000
ft2
Annual Production 187,800
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,999 2,974,368
kWh
Electricity Demand $60,130 668
kW-mo/yr
Electricity Fees $480 -
Natural Gas $89,979 8,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $456 $252 - - $456
-
MMBtu
02 2.4133: Use most efficient type of electric motors $228 $244 $156
4,840
kWh
$72
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $845 $770 $845
26,152
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,939 $20,513 $6,645
205,700
kWh
$3,294
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $605 $252 $410
12,695
kWh
$195
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,589 $24 $1,085
33,600
kWh
$504
-
kW-mo/yr
-
07 2.2135: Repair and eliminate steam leaks $2,001 $788 $1,366
42,298
kWh
$635
-
kW-mo/yr
-
08 2.2437: Recover waste heat from equipment $4,360 $1,100 - - $4,360
-
MMBtu
TOTAL RECOMMENDED $20,023 $23,943 $10,507
325,285
kWh
$4,700
-
kW-mo/yr
$4,816
-
MMBtu
TOTAL IMPLEMENTED $19,418 $23,691 $10,097
312,590
kWh
$4,505
-
kW-mo/yr
$4,816
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs