ITAC Assessment: IA0388
ITAC logo
ITAC Assessment: IA0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Electric Utility Equipment
NAICS 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 135,000
ft2
Annual Production 2,254
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,318 6,799,448
kWh
Electricity Demand $75,536 18,552
kW-mo/yr
Natural Gas $88,807 11,034
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,792 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,190 $4,918 $3,472
110,601
kWh
$718
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,183 $6,385 $1,639
52,198
kWh
$544
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $2,587 $3,234 $2,587
82,391
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $2,069 $1,000 $2,069
65,894
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,869 $480 $3,205
102,063
kWh
$664
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,922 $52 $2,422
77,126
kWh
$500
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $1,279 $1,972 $1,092
28,798
kWh
$187
-
kW-mo/yr
-
08 2.1121: Use insulation in furnaces to facilitate heating / cooling $47,693 $45,600 $(-1,878.0)
(-57,754)
kWh
$(-388.0)
-
kW-mo/yr
$49,959
-
MMBtu
TOTAL RECOMMENDED $66,792 $63,641 $14,608
461,317
kWh
$2,225
-
kW-mo/yr
$49,959
-
MMBtu
TOTAL IMPLEMENTED $65,513 $61,669 $13,516
432,519
kWh
$2,038
-
kW-mo/yr
$49,959
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs