ITAC Assessment: IA0380
ITAC logo
ITAC Assessment: IA0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product ham, sausage, bacon
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 94
Plant Area 70,000
ft2
Annual Production 5,800,000
lb
Production Hrs. Annual 2,959
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,878 2,163,657
kWh
Electricity Demand $29,400 5,424
kW-mo/yr
Electricity Fees $1,581 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $336 $25 $232
4,374
kWh
$104
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $685 $215 $471
9,617
kWh
$214
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $262 $879 $213
4,343
kWh
$49
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,513 $8,142 $2,801
56,975
kWh
$712
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,037 $1,906 $2,432
49,999
kWh
$605
-
kW-mo/yr
- - - -
06 3.4111: Use closed cycle process to minimize waste water production $11,632 $4,000 - - - $7,368
-
Tgal
- $4,264
-
Tgal
07 3.4154: Eliminate leaks in water lines and valves $298 $650 - - - $189
-
Tgal
- $109
-
Tgal
08 2.4322: Use or replace with energy efficient substitutes $35,020 $29,000 - - $5,430
-
MMBtu
- $29,590 -
TOTAL RECOMMENDED $54,783 $44,817 $6,149
125,308
kWh
$1,684
-
kW-mo/yr
$5,430
-
MMBtu
$7,557
-
Tgal
$29,590 $4,373
-
Tgal
TOTAL IMPLEMENTED $1,283 $1,119 $916
18,334
kWh
$367
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs