ITAC Assessment: IA0373
ITAC logo
ITAC Assessment: IA0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product mechanic trucks, hook lifts
NAICS 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 150,396
ft2
Annual Production 600
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,121 2,201,607
kWh
Electricity Fees $4,334 -
Natural Gas $109,138 11,575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,447 $94 $1,447
16,800
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,881 $359 $1,881
21,841
kWh
-
03 2.4234: Cool compressor air intake with heat exchanger $1,412 $143 $1,412
16,403
kWh
-
04 2.2437: Recover waste heat from equipment $1,473 $1,147 - $1,473
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,419 $5,844 $3,419
39,708
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,460 $12,810 $7,460
88,636
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,784 $2,706 $3,784
43,953
kWh
-
08 2.7135: Install occupancy sensors $1,668 $1,925 $1,668
19,379
kWh
-
09 2.2531: Re-size charging openings or add movable cover or door $9,792 $6,208 - $9,792
-
MMBtu
TOTAL RECOMMENDED $32,336 $31,236 $21,071
246,720
kWh
$11,265
-
MMBtu
TOTAL IMPLEMENTED $29,221 $29,217 $17,956
210,541
kWh
$11,265
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs