| Assessment Year | 2005 |
|---|---|
| Principal Product | mechanic trucks, hook lifts |
| NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
| SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
150,396
ft2
|
| Annual Production | 600
pieces
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $190,121 | 2,201,607 |
kWh
|
$0.086 |
| Electricity Fees | $4,334 | - |
|
- |
| Natural Gas | $109,138 | 11,575 |
MMBtu
|
$9.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,336 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,221 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,447 | $94 |
$1,447
16,800
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,881 | $359 |
$1,881
21,841
kWh
|
- | |
| 03 | 2.4234: Cool compressor air intake with heat exchanger | $1,412 | $143 |
$1,412
16,403
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,473 | $1,147 | - |
$1,473
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,419 | $5,844 |
$3,419
39,708
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,460 | $12,810 |
$7,460
88,636
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,784 | $2,706 |
$3,784
43,953
kWh
|
- | |
| 08 | 2.7135: Install occupancy sensors | $1,668 | $1,925 |
$1,668
19,379
kWh
|
- | |
| 09 | 2.2531: Re-size charging openings or add movable cover or door | $9,792 | $6,208 | - |
$9,792
-
MMBtu
|
|
| TOTAL RECOMMENDED | $32,336 | $31,236 |
$21,071
246,720
kWh
|
$11,265
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $29,221 | $29,217 |
$17,956
210,541
kWh
|
$11,265
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs