ITAC Assessment: IA0372
ITAC logo
ITAC Assessment: IA0372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Submersible pumps and agricultural products
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $5
M
to 10
M
# of Employees 27
Plant Area 200,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,333 480,079
kWh
Natural Gas $73,788 8,514
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $496 $619 $496
10,108
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $381 $510 $381
5,106
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,734 $5,978 $1,734
23,298
kWh
- -
04 2.7135: Install occupancy sensors $519 $462 $519
6,957
kWh
- -
05 2.7229: Air condition only space necessary $45,000 $75,000 - $17,500
-
MMBtu
$27,500
06 2.7491: Insulate glazing, walls, ceilings, and roofs $1,091 $3,517 - $1,091
-
MMBtu
-
TOTAL RECOMMENDED $49,221 $86,086 $3,130
45,469
kWh
$18,591
-
MMBtu
$27,500
TOTAL IMPLEMENTED $48,130 $82,569 $3,130
45,469
kWh
$17,500
-
MMBtu
$27,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs