| Assessment Year | 2005 |
|---|---|
| Principal Product | Intermediate Bulk Liquid Containers |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
133,000
ft2
|
| Annual Production | 13,200
pieces
|
| Production Hrs. Annual | 4,625
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $51,167 | 2,198,265 |
kWh
|
$0.023 |
| Electricity Demand | $95,142 | 8,904 |
kW-mo/yr
|
$10.69 |
| Electricity Fees | $2,401 | - |
|
- |
| Natural Gas | $158,904 | 21,751 |
MMBtu
|
$7.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $242,582 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,080 | $1,210 |
$1,839
81,128
kWh
|
$2,241
-
kW-mo/yr
|
- | - | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,156 | $6,174 |
$974
42,891
kWh
|
$1,182
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,554 | $6,744 |
$524
22,986
kWh
|
$1,030
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $3,547 | $8,960 |
$974
42,925
kWh
|
$2,573
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $1,078 | $900 | - | - |
$1,078
-
MMBtu
|
- | - | - | - | |
| 06 | 4.111: Add equipment/ operators to reduce production bottleneck | $6,250 | $1,800 | - | - | - | - | $6,250 | - | - | |
| 07 | 4.448: Install automatic part storage / retreval system | $37,500 | $15,000 | - | - | - | - | $37,500 | - | - | |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,562 | $425 | - | - | - | - | $1,562 | - | - | |
| 09 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,040 | $640 | - | - | - | - | $1,040 | - | - | |
| 10 | 4.111: Add equipment/ operators to reduce production bottleneck | $26,250 | $650 | - | - | - | - | $26,250 | - | - | |
| 11 | 3.3131: Use evaporation to concentrate material | $18,149 | $1,500 | - | - | - |
$18,149
-
gal
|
- | - | - | |
| 12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,870 | $1,000 | - | - |
$1,870
-
MMBtu
|
- | - | - | - | |
| 13 | 4.131: Modify process to reduce material use/cost | $31,486 | $50,000 | - | - | - | - | - | $31,486 | - | |
| 14 | 4.111: Add equipment/ operators to reduce production bottleneck | $106,060 | $8,250 | - | - | - | - | - | - | $106,060 | |
| TOTAL RECOMMENDED | $242,582 | $103,253 |
$4,311
189,930
kWh
|
$7,026
-
kW-mo/yr
|
$2,948
-
MMBtu
|
$18,149
-
gal
|
$72,602 | $31,486 | $106,060 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs