Assessment Year | 2005 |
---|---|
Principal Product | Intermediate Bulk Liquid Containers |
NAICS | 332618: Other Fabricated Wire Product Manufacturing |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
133,000
ft2
|
Annual Production | 13,200
pieces
|
Production Hrs. Annual | 4,625
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,167 | 2,198,265 |
kWh
|
$0.023 |
Electricity Demand | $95,142 | 8,904 |
kW-mo/yr
|
$10.69 |
Electricity Fees | $2,401 | - |
|
- |
Natural Gas | $158,904 | 21,751 |
MMBtu
|
$7.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $242,582 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,080 | $1,210 |
$1,839
81,128
kWh
|
$2,241
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,156 | $6,174 |
$974
42,891
kWh
|
$1,182
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,554 | $6,744 |
$524
22,986
kWh
|
$1,030
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $3,547 | $8,960 |
$974
42,925
kWh
|
$2,573
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $1,078 | $900 | - | - |
$1,078
-
MMBtu
|
- | - | - | - | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $6,250 | $1,800 | - | - | - | - | $6,250 | - | - | |
07 | 4.448: Install automatic part storage / retreval system | $37,500 | $15,000 | - | - | - | - | $37,500 | - | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,562 | $425 | - | - | - | - | $1,562 | - | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,040 | $640 | - | - | - | - | $1,040 | - | - | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $26,250 | $650 | - | - | - | - | $26,250 | - | - | |
11 | 3.3131: Use evaporation to concentrate material | $18,149 | $1,500 | - | - | - |
$18,149
-
gal
|
- | - | - | |
12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,870 | $1,000 | - | - |
$1,870
-
MMBtu
|
- | - | - | - | |
13 | 4.131: Modify process to reduce material use/cost | $31,486 | $50,000 | - | - | - | - | - | $31,486 | - | |
14 | 4.111: Add equipment/ operators to reduce production bottleneck | $106,060 | $8,250 | - | - | - | - | - | - | $106,060 | |
TOTAL RECOMMENDED | $242,582 | $103,253 |
$4,311
189,930
kWh
|
$7,026
-
kW-mo/yr
|
$2,948
-
MMBtu
|
$18,149
-
gal
|
$72,602 | $31,486 | $106,060 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs