ITAC Assessment: AM0237
ITAC logo
ITAC Assessment: AM0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Fiberglass composite fabrics, weave specialty fabrics
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $50
M
to 100
M
# of Employees 242
Plant Area 190,000
ft2
Annual Production 87,900
thousand feet
Production Hrs. Annual 5,832
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $578,972 10,037,222
kWh
Natural Gas $225,456 70,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,890 $5,000 $7,890
175,264
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,400 $41 $5,400
105,803
kWh
-
03 2.2511: Insulate bare equipment $2,700 $620 - $2,700
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,700 $1,000 - $1,700
-
MMBtu
05 2.7145: Install skylights $1,300 $1,400 $1,300
28,722
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $925 $550 $925
4,396
kWh
-
07 2.4314: Use synthetic lubricant $915 - $915
17,585
kWh
-
08 2.4133: Use most efficient type of electric motors $910 $1,100 $910
17,585
kWh
-
TOTAL RECOMMENDED $21,740 $9,711 $17,340
349,355
kWh
$4,400
-
MMBtu
TOTAL IMPLEMENTED $20,440 $8,311 $16,040
320,633
kWh
$4,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs