Assessment Year | 2005 |
---|---|
Principal Product | Casement Windows |
NAICS | 321911: Wood Window and Door Manufacturing |
SIC | 2431: Millwork |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
450,000
ft2
|
Annual Production | 620,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $371,992 | 9,220,680 |
kWh
|
$0.040 |
Electricity Demand | $143,675 | 22,704 |
kW-mo/yr
|
$6.33 |
Electricity Fees | $29,786 | - |
|
- |
Natural Gas | $123,697 | 15,649 |
MMBtu
|
$7.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,055 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,673 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4234: Cool compressor air intake with heat exchanger | $5,128 | $1,344 |
$3,906
96,623
kWh
|
$1,222
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $20,682 | $12,835 | - | - |
$20,682
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,962 | $1,023 |
$7,298
180,648
kWh
|
$2,664
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,383 | $15,627 |
$7,197
178,139
kWh
|
$2,186
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $971 | $2,171 |
$675
16,680
kWh
|
$296
-
kW-mo/yr
|
- | |
06 | 2.7124: Make a practice of turning off lights when not needed | $20,328 | - |
$20,328
503,193
kWh
|
- | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $2,742 | $95 |
$2,742
67,886
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $859 | $1,617 |
$859
21,464
kWh
|
- | - | |
TOTAL RECOMMENDED | $70,055 | $34,712 |
$43,005
1,064,633
kWh
|
$6,368
-
kW-mo/yr
|
$20,682
-
MMBtu
|
||
TOTAL IMPLEMENTED | $39,673 | $16,650 |
$34,823
861,980
kWh
|
$4,850
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs