ITAC Assessment: IA0362
ITAC logo
ITAC Assessment: IA0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Pre-engineered buildings
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 230,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 5,512
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,243 3,516,585
kWh
Electricity Demand $125,331 9,816
kW-mo/yr
Electricity Fees $12,362 -
Natural Gas $182,659 24,617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $385 $30 $202
6,614
kWh
$183
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,270 $1,000 $4,339
142,105
kWh
$3,931
-
kW-mo/yr
- - -
03 2.4234: Cool compressor air intake with heat exchanger $845 $207 $465
15,177
kWh
$380
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,552 $3,000 $496
16,280
kWh
$1,056
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $429 $502 $210
6,893
kWh
$219
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $511 $1,309 $511
16,762
kWh
- - - -
07 2.2531: Re-size charging openings or add movable cover or door $791 $350 - - $791
-
MMBtu
- -
08 2.2531: Re-size charging openings or add movable cover or door $6,630 - - - $6,630
-
MMBtu
- -
09 2.4133: Use most efficient type of electric motors $352 $471 $184
6,036
kWh
$168
-
kW-mo/yr
- - -
10 4.513: Re-arrange equipment layout to reduce labor costs $6,630 $2,280 - - - $6,630 -
11 4.821: Pay bills on time to avoid late fees $1,000 - - - - - $1,000
TOTAL RECOMMENDED $27,395 $9,149 $6,407
209,867
kWh
$5,937
-
kW-mo/yr
$7,421
-
MMBtu
$6,630 $1,000
TOTAL IMPLEMENTED $10,603 $4,973 $5,229
171,314
kWh
$5,374
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs